Pre-engineered, pre-fabricated components make it easy to design and install transfer point skirtboards and stilling zones to manage air flow and control dust. Compatible with Martin® External Wear Liner and Martin® Belt Sealing.

Features and Benefits:

  • Pre-engineered, pre-fabricated components make it easy to design and install transfer point skirtboards and stilling zones to manage air flow and control dust
  • Replace your existing skirtboard with a modular chute wall eliminating confined space maintenance
  • Allows improved control of air velocity to reduce the escape of airborne dust
  • Modular sections bolt together to reduce installation labor. No field engineering and cutting; no material waste
  • Pre-fabricated modular sections provide a precise fit to requirements of each specific conveyor load zone
  • Factory-fabricated sections are easier to maneuver and install than sheet steel
  • Compatible with Martin® External Wear Liner and Martin® Skirtboard Systems

Our technicians and engineers are available to provide expert advice and assistance on this product and all of your bulk material handling questions and problems. Please contact us today and let us help!

Resources

Brochure - Conveyor Products Download

View Additional Resources

We Solved Their Problems!
Let us help you solve yours as well. All products and services provided by Martin Engineering carry our Absolutely No Excuses Guarantee. If we don't solve your problem, we will fully refund your money or provide a different solution for you. Period.
Paper Plant Having Trouble With Fugitive Material
The release of airborne dust can cause health concerns and create negative attention from regulatory agencies. Any material that spills off the conveyor is a loss - loss in material, profit and efficiency. The spillage also creates the need for manual cleanup which takes man-hours and is a dangerous task - putting workers in harm's way.
Read Case Study
EVO® External Wear Liner Stops Spillage On Belt Feeders
At a generating plant, 5000 tons per day of PRB coal are metered via belt feeder onto conveyors and into the plant's ten bunkers. With surge of material as railcars unload, combined with the high head pressure from the hoppers, the belt feeders suffered extensive spillage. This spillage was compounded by the worn-out condition of the chutes.
Read Case Study
Chute Clogging And Spillage Corrected With CleanScrape® Cleaner
A coal-fired power plant was having chute clogging and spillage issues. The existing primary and secondary cleaners allowed uneven discharge of material, which clung to chute walls and caused clogging, requiring periodic downtime for adjustment. The blade edges wore quickly, causing enough carryback and spillage to encapsulate the cleaners.
Read Case Study

Free Engineering and Application Assistance

Our technicians have solved problems for people in your industry all over the world. Take advantage of our wealth of knowledge. Tell us about your situation today to learn how Martin can improve your performance, safety and bottom line - with no obligation. We want to ensure that you choose the right solution for your exact needs and we are willing to invest the time upfront to get it right the first time.

Briefly Describe Your Application